# Building sites

Temporary charging on construction sites: chargers that go up and come down with the site, a temporary connection, no data cabling, load management over the air with GridShield, and an outlet box that turns a charger into a 230 V or three-phase power point.

Canonical: https://edgetech.eu/solutions/building-sites  
Updated: 2026-10-28

![Building site: a controller at the temporary connection sends the limit by radio to chargers that move with the site, no data cable](/img/solutions/building-sites.svg)

## What is different on a site

The connection is temporary and often small, the chargers move, nobody wants to pull data cables through a site, and the equipment has to survive the site. The requirements list for this application is being written; ask for the current one.

## What we do

GridShield controller at the site connection, receivers at the chargers, all over LoRa point-to-point. Chargers are simple grey-box units that can be moved. The platform gives the site manager the overview and the warnings.

## Power outlets from a charger

The same charger that charges the site's vans can power the tools. Our outlet box is made for public chargers: its cable has a Type 2 plug, the same plug a car cable has, so it fits any charger with a socket. It gives you sockets with current limiting:

- **230 V:** ordinary wall sockets, for tools, lights and site huts;
- **3 × 230 V:** a red three-phase socket, for heavier equipment.

The box obeys the current the charger advertises, just as a car does. If the tools draw more than that, the box switches off, so the charger's load management keeps the site connection safe. Built for construction sites. [Ask us](/contact?about=building-sites) about versions and prices.

## Parts

Simple chargers; the outlet box; [GridShield](/products/gridshield) controller and receivers; the platform.