Skip to contentCharger not charging? Check it here →

Standards

EU rules, standards and protocols

Every European law, standard and protocol that matters for AC EV charging, what it covers, and where EdgeTech stands: Yes, Soon, On order, Planned, No, or Not applicable. Includes the AFIR requirement for ISO 15118-20 in all new Mode 3 charge points from 1 January 2027, the RED cybersecurity rules, the Cyber Resilience Act and the Dutch NTA 8043 register.

View as MarkdownUpdated 2026-10-14

This page lists what applies to AC charging in Europe: laws first, then product standards, radio and security, installation, vehicle communication, energy management and metering, and national rules. The status table has the detail of what our products implement.

Status words on this page:

  • Yes: our products comply with it or implement it today.
  • Soon: required for what we sell, and being prepared; not yet in the product or in its declaration.
  • On order: a working implementation, finished into a product when a customer orders it.
  • Planned: on the roadmap.
  • No: not supported.
  • Not applicable: does not apply to AC chargers, or to the part of the chain we make.

Coming up

  • ISO 15118-20 in every new charger from 1 January 2027. The EU charging-infrastructure regulation (AFIR, as amended by Delegated Regulation (EU) 2025/656) requires EN ISO 15118-20 for every Mode 3 charge point installed or renovated from that date, private as well as public. Existing charge points are exempt until they are renovated. Our ISO 15118 module adds it to the charge controller.
  • Cybersecurity of connected devices. Internet-connected radio equipment must meet the RED cybersecurity rules (EN 18031) since 1 August 2025. The Cyber Resilience Act applies in full from 11 December 2027; its duty to report actively exploited vulnerabilities applies since 11 September 2026. Found a weakness in one of our products? Report it here.
  • Smart charging in buildings. The recast Energy Performance of Buildings Directive is in Dutch law since 29 May 2026: pre-cabling and smart-charging-ready charge points in new and renovated buildings.

EU law

Law What it covers Status
Low Voltage Directive 2014/35/EU Electrical safety Yes
EMC Directive 2014/30/EU Electromagnetic compatibility Yes
RoHS Directive 2011/65/EU Hazardous substances Yes
Radio Equipment Directive 2014/53/EU Products with a radio: site controllers (WiFi), Matter set (Thread), NFC reader, GridShield (LoRa) Soon: declarations under RED for every radio product
RED Delegated Regulation (EU) 2022/30 Cybersecurity of internet-connected radio equipment, from 1 August 2025 Soon
Cyber Resilience Act (EU) 2024/2847 Security of products with software; vulnerability reporting from 11 September 2026, in full from 11 December 2027 Soon
AFIR (EU) 2023/1804 and Delegated Regulation (EU) 2025/656 Connectors, vehicle communication, payment and prices at public charge points Type 2: Yes. ISO 15118-20 for new Mode 3 points from 2027: Soon. Public ad-hoc payment: not applicable to our chargers
Energy Performance of Buildings Directive (EU) 2024/1275 Charge points, pre-cabling and smart charging in buildings Yes
Data Act (EU) 2023/2854 Users’ access to the data their connected device produces Soon: data export from the app
Measuring Instruments Directive 2014/32/EU (MID) Legal metering for billing On order

Product safety and EMC

Standard What it covers Status
EN IEC 61851-1:2019 (IEC 61851-1 Ed. 3) Conductive charging, Mode 3, control pilot Yes
IEC 61851-1 Ed. 4 Next edition, in preparation at IEC We follow it
EN IEC 61851-21-2:2021 EMC of charging equipment Soon: in the updated declaration
IEC 62955:2018 RDC-DD: DC residual current detection in the charge point, 6 mA Yes, the RDC-DD in every charger
IEC 62752 Protection device in a Mode 2 charging cable (IC-CPD) Not applicable
EN IEC 62196-1/-2:2022 Plugs and sockets, Type 2 Yes
EN 50620 Charging cables Yes
EN 17186 Compatibility labels on charge points and cables Soon
EN 62368-1 Safety of communication equipment Soon: in the updated site-controller declaration
EN 62311 / EN 62479 Exposure to radio fields Yes

Radio and cybersecurity

Standard What it covers Status
EN 300 328, EN 301 489-1/-17 WiFi and Thread at 2.4 GHz Yes
EN 300 330, EN 301 489-3 NFC at 13.56 MHz Soon
EN 300 220, EN 301 489-3 LoRa at 868 MHz (GridShield) Soon
EN 18031-1/-2 RED cybersecurity: network protection and privacy Soon
CRA harmonised standards (prEN 40000 series) Security requirements under the Cyber Resilience Act Soon, when published
Thread, CSA Matter certification Matter certification Thread: Yes. Certification: on order (not yet Matter certified)

Installation

Standard What it covers Status
IEC 60364-7-722 / HD 60364-7-722 Installation of charge points: own circuit, DC fault protection Yes: with the RDC-DD a Type A RCD is enough
NEN 1010:2020, section 722 The same, in the Netherlands Yes: our installation manuals follow it

Vehicle communication

Standard What it covers Status
IEC 61851-1 PWM signalling Current limit through the control pilot Yes
EN ISO 15118-1 to -5 (-2:2016) Digital communication, Plug & Charge; required at public points from 8 January 2026 On order
EN ISO 15118-20:2022 Next generation: TLS 1.3, dynamic control, bidirectional; required at all new Mode 3 points from 1 January 2027 Soon
ISO/PAS 15118-202:2025 Interoperability profile for ISO 15118 Planned, with the module
DIN 70121, CHAdeMO, NACS, MCS (IEC 61851-23-3) DC charging Not applicable: AC chargers
IEC 61980 series Wireless charging Not applicable

Back-office, energy management and grid

Standard or protocol What it covers Status
OCPP 1.6J Charger to back-office On order
OCPP 2.0.1 (IEC 63584:2024), OCPP 2.1 (IEC 63584-210:2025) Charger to back-office, with ISO 15118 and V2X No, not until 1.6J is in production
OCPI, OICP, OCHP Roaming between operators Not applicable: back-office side
OSCP 2.0 Capacity forecasts from grid operator to charge point operator No
GridShield (ElaadNL) Emergency limit from the grid operator by radio Yes, tested both ways with ElaadNL
S2 (EN 50491-12-2) Home energy manager to flexible devices Planned
IEC 63380 series Charger to local energy manager We follow it
EEBus SPINE/SHIP Energy management, heat pumps Planned
Matter 1.4 Energy EVSE, Device Energy Management, Electrical Power Measurement Smart home and energy managers On order; not yet Matter certified (CSA)
OpenADR 2.0b / 3.0 Demand response No
IEEE 2030.5 Smart energy profile Not applicable in the Netherlands and Belgium
Modbus RTU, open register map Control of the charge controller Yes
Modbus TCP, SunSpec Inverters On the integration side
SG-Ready Heat pump two-contact interface Yes
MQTT over TLS Device to platform Yes
EN 50549 Grid connection of generators Not applicable until V2G

Metering

Standard What it covers Status
MID annex MI-003, EN 50470-1/-3 Legal metering of energy On order: MID option on the on-board metering
German calibration law (Eichrecht) Signed meter readings for billing in Germany No
DSMR 5.0.2 P1 Dutch smart meter port Yes
e-MUCS P1 (Fluvius) Belgian smart meter port Yes

National rules

Country Rule What it covers Status
Netherlands NTA 8043:2024 and the NEN self-declaration register (July 2026) Smart charge points and charging services Planned: self-declaration on request
Netherlands Bbl (building rules, EPBD) Charge points and pre-cabling in buildings Yes
Germany §14a EnWG Grid operator control of chargers above 4.2 kW No
United Kingdom Smart Charge Points Regulations 2021 Smart charging and security (outside the EU) No